Construction consulting and cost estimating
Consulting & Cost Estimation

Construction consulting and cost estimating

Technical advice, cost estimates and project-related economic reporting for building and civil projects, from the first feasibility question onward.

Years in Operation
47
Documented Projects
37
Units in residential and mixed-use projects
14,252
Mass-Housing Grade
1

Advice grounded in contracting

Olbrich has delivered housing, healthcare, education and infrastructure contracts in Iran since 1979. The consulting service brings that contracting background to a client’s decisions before and during a project.

Each engagement is scoped to the decision the client needs to make: whether a project is viable, which option to choose, what a realistic budget and programme look like, or how to compare bids on more than the initial price.

What the service covers

  • Feasibility advice

    Early review of the site, programme and constraints to test whether a project is viable.

  • Cost estimates

    Estimates at concept and design stages, with quantities and assumptions stated.

  • Option and bid comparison

    Comparison of options and bids on cost, programme and the cost of operating and maintaining what is bought.

  • Economic reporting

    Cash-flow forecasts and project-related economic reports.

  • Technical review

    Review of designs, programmes and construction methods before commitment.

How the work runs

  1. The decision

    Define the question the client needs answered.

  2. The data

    Collect drawings, site information and current prices.

  3. The analysis

    Estimate, compare options and state the assumptions.

  4. The report

    Deliver a recommendation with its risks and the evidence behind it.

Related Field Notes

Evidence-led guidance from Olbrich’s technical office on this area of work.

Frequently asked questions

What does Olbrich’s consulting service cover?

Technical advice, cost estimates and project-related economic reports, including comparison of options and bids.

What information is needed for a cost estimate?

The site location, intended use and size, any drawings available and the target programme. The more complete the design, the narrower the estimate range.

Why compare bids on more than price?

Equipment and systems keep costing money after purchase through energy, maintenance and replacement. A Field Note on this page sets out a life-cycle cost comparison method.

How do I start a project enquiry with Olbrich?

Call +98 21 4438 6406 or email Info@Olbrichco.com with the project location, intended use, approximate size and the stage the project has reached. The Tehran office (Unit 408, Alvand Tower, Ebrahimi Street, Marzdaran) is open Saturday to Wednesday 8:00–17:00 and Thursday 8:00–13:00.