
Where Did the Water Go? A Building-Level Plan for Finding Leaks
A practical water-balance and leak-response plan for Iranian buildings: account for storage tanks, specify useful meters, interpret night flow, and verify repairs.
Read field note
Maintenance and repair services for completed buildings and infrastructure, so that their systems keep working after handover.
Maintenance keeps the envelope watertight and the mechanical, electrical and water systems working, and deals with defects before they spread to other parts of the building.
Olbrich’s register includes buildings with demanding operating needs — Imam Ali Hospital and the Fatimah al-Zahra Clinic in Chabahar, faculty buildings and schools in Urmia — and housing complexes where many households depend on shared systems.
Scheduled inspection and servicing of building elements and systems.
Diagnosis and repair of defects in the structure, envelope and building services.
Tracing leaks and water losses at building level.
Servicing and replacement planning for pumps, cooling towers and other plant.
Maintenance logs and updated as-built records for the owner.
List the systems, their condition and their records.
Agree inspection frequencies and response times.
Carry out scheduled work and repairs.
Record what was done and what to plan for next.
Completed projects in Olbrich’s register, of the kinds that maintenance serves.

Social Security Organization, in partnership with Dobleh Company

Social Security Organization

Social Security Organization, in partnership with Dobleh Company

Urmia Faculty of Medical Sciences
Evidence-led guidance from Olbrich’s technical office on this area of work.

A practical water-balance and leak-response plan for Iranian buildings: account for storage tanks, specify useful meters, interpret night flow, and verify repairs.
Read field note
Less discharge is not automatically better operation. Give the cooling-tower team a verified water-quality envelope, trustworthy measurements and an agreed response before changing blowdown.
Read field note
A machine that fits during construction may have no replacement route after completion. Reserve the working space, removal path and operating arrangements before the plantroom closes.
Read field note
A practical handover method for Iranian building owners: identify control dependencies, govern service access, preserve usable backups, and demonstrate safe recovery without relying on a remote connection.
Read field noteMaintenance and repair of completed buildings and infrastructure, including building services and water systems.
Housing complexes, hospitals and clinics, schools and university buildings, government and commercial buildings, and roads, bridges and water networks.
Access routes, spare parts and records are easiest to secure before a building is occupied. Field Notes on this page explain the checks for plant access and controls handover.
Call +98 21 4438 6406 or email Info@Olbrichco.com with the project location, intended use, approximate size and the stage the project has reached. The Tehran office (Unit 408, Alvand Tower, Ebrahimi Street, Marzdaran) is open Saturday to Wednesday 8:00–17:00 and Thursday 8:00–13:00.
Architectural, structural, mechanical, and electrical design tailored to the project scope.
Management and delivery of residential, commercial, industrial, and infrastructure projects.
Planning, coordination, project controls, and risk management throughout delivery.
Renovation of existing buildings, performance improvements, and space upgrades.
Technical advice, cost estimates, and project-related economic reporting.